San Leandro Marina Replacement
San Leandro, CA
This project included the replacement of an existing timber floating dock system with a 250-berth concrete floating dock system, dredging, and all shoreside utilities and landscape improvements. NCI prepared the layout, performed the design, and prepared the final drawings, specifications, contract documents, and cost estimate for the replacement of the marina facilities. These facilities consisted of concrete berths, prestressed concrete piles, aluminum gangways, and concrete approach piers. Work involved extensive coordination with permitting agencies, along with preparation of a long-range operational dredge plan. NCI also performed full-time construction management and resident field inspection.