Sausalito Yacht Harbor Bulkhead Replacement
Sausalito, CA
NCI performed the engineering design for replacement of a 500-foot timber pile bulkhead. Services included a site and geotechnical investigation; topographic and boundary survey; feasibility analysis of alternative construction materials and methodologies; final design; and preparation of plans, specifications, contract documents and construction cost estimate. The improvements included a tied-back concrete sheet pile bulkhead, public promenade, landscaping, drainage and repavement of the parking lot.